88 Corporate Drive

Men's toilet partitions are complete.  The sink and vanity surrounds have been installed.  Ceiling and electrical are complete.

Complete - Toilet Partitions

Complete - Sink & Vanity Surround

Complete - Ceiling & Electrical

88 Corporate Drive

Benches and lockers are being installed in the Men's change room.  Tile work is almost complete in the Women's change room.  Installation of ceiling  tile is nearly complete throughout.

Complete - Lockers

Complete - Tile Work

Complete - Ceiling Tile

88 Corporate Drive

Flooring in Men's washroom is now complete and wall tile installation is well under way.  Expansion joint repair in Women's washroom continues.

Completed Flooring

 

In Progress Wall Tile

In Progress Expansion Joint Repair

88 Corporate Drive

Floor is being laid out in the Men's washroom and expansion joint is being repaired in the Women's washroom.

In Progress Flooring

In Progress Expansion Joint Repair

 

88 Corporate Drive

Here is the existing condition of the change rooms we are about to renovate to barrier free accessible standards. Classic 1980’s salmon pink and mint green. I think it even reverses for the boys!

Existing Floor Tiles

Existing Showers

Existing Sink/Vanity Area

 

Design Board

The proposed design that is starting implementation next week