1270 Maple Crossing

The new elevator lobby feature wall panels are being installed.  It will look fabulous when the tape and protective papers are finally removed in a couple more weeks.

In Progress Elevator Lobby Panels

In Progress Elevator Lobby Panels Opposite Side

In Progress Elevator Lobby Panels Opposite Side

 

1270 Maple Crossing

The tile is being laid down in a very busy parking level corridor. The residents have been very patient through this 2 week process.  We did a test mock up of the film which is going to be installed on the guest suite doors. It has held up very well over our 6 month test even though we didn’t have it installed perfectly. The real install will be primed and heat melded for permanent adhesion.

 

Corridor Work in Progress

Tile Pattern Close Up

Tile Pattern Close Up

Test Mock Up for Guest Suite Doors

1270 Maple Crossing

As the old saying goes, you can’t make an omelette without breaking a few eggs.  Well, right now, it looks like we broke the whole dozen!  Demolition is well underway, most of the old flooring is gone, along with wall tiles and the entire ceiling.  It may look like a mess, but this is a very exciting time as change starts to happen and you begin to see the new replacing the old.  The look will be updated and fresh, so stay tuned for regular updates! 

In Progress Ceiling Demolition

In Progress Flooring Demolition

 

1270 Maple Crossing

Renovating the lower level of this condominium building.  Phase 2 will be the corridors and Phase 3 will be the lobby.

Existing Elevator Lobby

Existing Elevator Lobby

Proposed Design that is Being Implemented